Monday, September 06, 2010
* I-4 W.I.M. Facility- Hillsborough County, FL
* Concrete in Construction
*A Gomaco Paving Train Gets Job Done With or Without an IDBI
* JCI Nominated for Sheldon G. Hayes Award
See All Articles

Earthwork PhotoEarthwork and underground utility installation is the backbone to any construction project.  During this phase of work is where the most un-foreseen conditions are encountered (i.e. un-suitable soil conditions, unknown utility conflicts, obstructions or weather delays).  The greatest amount of time can be made or lost based on a contractor’s preparedness for such conditions.  Being able to anticipate and handle these un-foreseen condition is what John Carlo, Inc. strives to achieve and therefore enables the greatest amount project success.  Through constant planning, daily pre-task analysis, scheduling and communication John Carlo, Inc. is able to ensure seamless integration on it's earthwork projects.

Typical daily earthwork activities John Carlo, Inc. handles with it’s fleet of scrapers, graders, excavators, end dumps, dozers, rollers, loaders and backhoe’s include but not limited to:

  • Clearing & Grubbing
  • Pavement Removal
  • Earth Excavation and Embankment
  • Ditching
  • Soil Stabilization
  • Site Grading
  • Underdrain or Edge Drain Installation
  • Subbase Installation
  • Slope Restoration
  • Building Pad Prep